About Lura d.d.
Few years ago Lura was the leading dairy company in Croatia,
and now Lura is a regional food company. Today Lura has
Dairy Products Division, Soft Drinks Division and Confectionery
Products Division. Lura operates its businesses not only
in Croatia, but also in Slovenia, Bosnia and Herzegovina
and Serbia and Montenegro.
Business situation
Reporting and business analysis for efficient and in time
decision-making was based on reports from transaction system.
Creating advanced parameterized queries on transaction data
required long time to produce and it became unacceptable
for users. This challenge was recognized on time and it
was decided to implement Analysis, Reporting and Planning
System in Lura.
Solution
Data Warehouse on Microsoft SQL Server 2000 Platform is
filling with the data from all business areas during the
night by Data Transformation Services. It enables daily
updating of OLAP reports. OLAP reports are created by Cognos
tools.
Server(s)
Microsoft SQL Server
Cognos PowerPlay Enterprise Server
Cognos Upfront Server
Windows Platform
Microsoft Windows 2000 Server
Vertical Industry
Food industry
Implementation Partner
Poslovna inteligencija d.o.o. |
Main goal of this project was
to implement integrated Reporting & Analysis system to cover
all business of Lura and associated companies in a way that all
users can prepare reports they need by themselves. According to
project aspect, OLAP implementation is one of the most successful
projects in Lura.
Business Challenge
Reporting and business analyses for efficient
and in time decision-making, was based on reports from Lura transaction
system, and also on Access and Excel tables. Those tables had
direct access to the transaction data. Time needed for new reports
preparation was not acceptable (sometimes it took several days,
or even more than a week). Creating some advanced parameterized
queries lasted longer and longer and it caused low level of user
satisfaction. A great number of analysts were involved in process
of editing data in Excel tables because it was only way to prepare
“flexible” reports, consolidations and analysis. The challenge
was recognized in time and it was decided to implement Analysis,
Reporting and Planning System in Lura.
Main goal of this project is to implement integrated
system to cover all business of Lura and associated companies
in a way that all users can prepare reports they need by themselves
(as easy as working with Excel) without any negative impact on
data integrity or analysis results. It was needed to integrate
this new system into existing IT infrastructure, in a way that
time needed for new reports and queries creation is acceptable
for users.
Solution
Transaction database is daily updated by business
data on central IBM AS/400 through applications developed in Lura.
Transaction data represents basic data source for Data Warehousing.
Some other data sources also exist, such as data from users Excel
tables. At the end of the day all data transactions and eventually
main data changes are updated in Data Warehouse by Data Transformation
Services, ODBC and OLE DB. Data Warehouse is on Microsoft SQL
Server 2000 Platform. There are about 430 tables from almost all
business areas in the Data Warehouse. Those tables are filled
and create about 230 DTS procedures. About 40 multidimensional
cubes are daily generated from Data Warehouse by Cognos PowerPlay
Transformation Server.
Ucers can consume daily reports and analysis at
Cognos PowerPlay Enterprise Server by Microsoft Internet Explorer
or PowerPlay Windows Client. Authorization is realized through
Microsoft Active Directory. Data reviews are additionally secured
by 128-bit encryption.
In the early stage, system was measured for 100
interactive users who were analyzed business data of actual year
and the year before. In the time when project was closed, the
number of users increased to almost 300 active users.
Data Warehouse is more than 120 GB large. Together
with OLAP structures, it is about 150 GB. There are five Intel
based Servers dedicated for OLAP system (one for Data Warehouse,
one for OLAP server and three smaller servers for development
and OLAP cubes creation during night).
Project implementation has started on April 2002
(after platform and partner definition). The project is officially
finished on December 31, 2003. Last four months of the project
were spent exclusively for documentation and knowledge transfer.
As development methodology allows cube prototype
usage, cubes were reviewed and iterative improved almost every
day due to users needs. The project was also adapted to new Lura
organization.
Model integrity is achieved by conform dimension
usage (collection point of Data Warehouse). Project leaders were
defined both from business side and from partner’s side. Project
supervision was conducted through Supervision team with Executive
sponsor of OLAP (Board member) as a head of Supervision team.
IT Coordinator was dedicated to assure that IT activities needed
for this project would be realized.
First module (seven in total) was taken over by
users after 10 weeks of intensive work. Big reorganization was
conducted in Lura after three modules were delivered to the users.
Therefore all delivered modules and Data Warehouse structure had
to be adopted to fulfill new business needs. Because of the reorganization,
project took a few months more than it was planned.
The same model of Data Warehouse, after the implementation
in Lura, was implemented also in associated companies.
Business Advantages
This System covers reporting and analyzing of
all business segments on daily basis. There is no problem any
more with delayed information in decision-making process. Results
are presented either in static form in PDF format, or through
web interface.
After standard periodic reports structure preparation,
reports are ready to use according to users queries, without any
need for analyzers. The System allows multidimensional analyze
of revenues and expenditures, costs structure, key performance
indicators, financial positions, stocks, investments, profit and
loss statement, cash flow, sales and plan comparison at daily
level, payment tracking from, HR costs and all other important
business indicators.
Analysts now spend much more time analyzing the
information, defining new analytical models and making improvements
to reporting and analyzing process and standards. Users can now
use distributed reports and find more detailed information when
they need it by themselves through web browser.
The System assures top standard data integrity
because there is no need for reediting the data. Web browser usage
reduces PCs administration and assures high-level access flexibility
and review of business information. Work from the distance is
now simple and efficient. If it is needed, models can be changed
on daily basis.
Statements
Olivera Buzadžić, Director of Internal Revision & Project
Leader
According to project aspect, OLAP implementation
is one of the most successful projects in Lura. Nevertheless during
the implementation Lura has introduced new organization and has
incorporated Lura Drinks (January 01 2003), the project was realized
in acceptable time and in budget. We strongly believed that Cognos
OLAP implementation would improve our reporting system. However,
results were higher than most optimistic expectations. But, only
users can really testify how the System works and they can evaluate
if this project is successful or not:
Božo Pržić, Logistic
“In certain areas, such as “Realization” and “Stock
level and flow” the potential of COGNOS System is almost beyond
any limitations.”
Meri Lovrić, Dairy Division, services in sales
“We needed two persons at least 2 – 3 days to
produce monthly realization report before COGNOS. Today we need
one person working only few hours to do the same job.”
Mario Pranjić, Soft Drinks Division, Operative
Controlling
“We produce about 10 new analyzes daily and weekly
after the COGNOS installation; monthly even more, about 50 new
analyzes...”
Tanja Janković, Central Controlling
“After COGNOS installation, we produce detailed
analyze of material costs by all cost centers and by each material.
This, very detailed report, couldn’t be produced before COGNOS
installation because of it’s complexity.”